Slurry Pipeline Project

Ausino Projects was engaged to complete fabrication works to 100NB St Slurry Pipelines at our clients site. The project was implemented in two portions, with the first to occur over a 6 day Shutdown, however operations could not afford this duration. Ausino Projects worked closely with the client and developed an alternative plan, allowing small parcels of work, to be performed and some work ‘off line’, to ensure no impact on operations. No variations have been applied due to this change, providing the client value in challenging times.

The second stage, completed by our Ausino Projects site team, utilised HDPE poly welding and pre-fabricated 316 St St pipe spools. Working closely with the client, the project was delivered with limited interruption to operations, quality performance, and to the relevant Australian Standards, with a zero harm approach to both safety and environment. #engineering#manufacturing #pipeline #maintenance #safety #quality #environment #gladstone #coalmining #stainlesssteelpipe #hdpepipe #ausinoprojects

Previous
Previous

Gantry Winch Access

Next
Next

Confined Space Container