Proof of Load Testing

Ausino Projects’ Engineering Team have performed Proof of Load Testing to our client’s onsite lifting equipment. The scope involved full management of all WHSE requirements, engineering review, design and process execution of the Load Test and final RPEQ certification and reporting. 

This test was performed above water working around tides, operational schedule, barge and crane requirements.

#engineering #testing #design #manufacturing #loadtesting

Previous
Previous

Davit Crane and Platform

Next
Next

Aluminium Access Platform